KONG Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Res…
USD 150.29 USD
Specifications
| Hand Retrieve | Both |
| Action | Fast |
| Size | 10'0''-mh-fast-2pcs |
| Included Components | 2 Pieces |
| Age Range Description | Adult |
| Material Type | Graphite |
| Tension Supported | High |
| Item Height | Fishing Rods |
| Style | Spin |
| Rod Reel Seat | Fixed |
| Item Width | Fishing Rods |
| Rod Power | Medium |
| Lure Weight | 2-8 oz |
| Fishing Rod Power | Medium |
| Line Weight | 15-40 lb |
| Color | Black |
| Material | Graphite |
| Set Includes | Fishing Rods |
| Rod Handle Material | EVA |
| Rod Action | Fast |
| Rod Type | Spinning Rod |
| Brand | Unbranded |
| Grip Type | Fighting Butt |
| Fishing Type | Freshwater Fishing |
| Grip Style | Fighting Butt |
| Fishing Technique | Spinning |
| Item Weight | 8 oz |
| Handle Material | Ethylene Vinyl Acetate |
| Product Line | Exclusive |
| Country Of Origin | China |
Powerful S-Curve Graphite Rod Blanks: Crafted from high-strength S-Curve graphite, reinforced with Nano-Resin technology, ensuring impressive strength and lifting power while maintaining exceptional sensitivity.