KONG Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Res…

KONG Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Res…

USD 161.99 USD
SKU: B6zPaqn3
Brand: Unbranded
GTIN: Does Not Apply
Condition: New
Categories: Fishing

Specifications

Hand RetrieveBoth
ActionFast
Size10'0''-mh-fast-2pcs
Included Components2 Pieces
Age Range DescriptionAdult
Material TypeGraphite
Tension SupportedHigh
Item HeightFishing Rods
StyleSpin
Rod Reel SeatFixed
Item WidthFishing Rods
Rod PowerMedium
Lure Weight2-8 oz
Fishing Rod PowerMedium
Line Weight15-40 lb
ColorBlack
MaterialGraphite
Set IncludesFishing Rods
Rod Handle MaterialEVA
Rod ActionFast
Rod TypeSpinning Rod
BrandUnbranded
Grip TypeFighting Butt
Fishing TypeFreshwater Fishing
Grip StyleFighting Butt
Fishing TechniqueSpinning
Item Weight8 oz
Handle MaterialEthylene Vinyl Acetate
Product LineExclusive

Powerful S-Curve Graphite Rod Blanks: Crafted from high-strength S-Curve graphite, reinforced with Nano-Resin technology, ensuring impressive strength and lifting power while maintaining exceptional sensitivity.

Related Items