Kapstan Saltwater Spinning Rod, Boat & Surf Fishing Rod, Lightweight S-Curve …
USD 152.09 USD
Specifications
| Hand Retrieve | Both |
| Action | Moderate Fast |
| Target Species | Saltwater Fish |
| Unit Count | 1 Count |
| Size | Spin-6'6"-m |
| Material Type | Graphite |
| Tension Supported | Medium |
| Item Height | Saltwater Fishing Rod |
| Style | Spin-6'6"-m-mf |
| Item Type Name | Fishing-rods |
| Unit Quantity | 1 count |
| Rod Reel Seat | Sliding Ring |
| Item Width | Saltwater Fishing Rod |
| Rod Power | Medium |
| Lure Weight | Not Specified |
| Line Weight | 30-50 lb |
| Color | Blue |
| Rod Handle Material | Ethylene Vinyl Acetate |
| Rod Action | Moderate Fast |
| Rod Type | Spinning Rod |
| Brand | Unbranded |
| Grip Type | Split |
| Fishing Type | Saltwater Fishing |
| Grip Style | Split |
| Fishing Technique | Spinning |
| Item Weight | Not Specified |
| Handle Material | Ethylene Vinyl Acetate |
This exquisite fishing rod is specifically designed for both boat and surf fishing, providing superior performance in demanding saltwater applications. Engineered for strength and reliability, this rod is the perfect ally for targeting a variety of saltwater species such as redfish, striped bass, drum, snook, and tarpon.